Traffic

Click to Interact
Type
Location
Description
Time
incident
I-495SB
Multi-vehicle accident. in Middleboro on Rt 495 SB before EX 15 - Rt-44, stop and go traffic back to EX 19 - Rt-24
construction
RT-24Both NB/SB
Work crew in Raynham on RT-24 NB/SB between EX 20 - Rt-44 and EX 24 - Rt-104
incident
US-6EB
Crash in Sandwich on Rt 6 EB before EX 63 - Chase Rd, stop and go traffic back to EX 61 - Quaker Meeting House Rd
construction
I-90WB
New road construction layout in Weston on Mass Pike WB at EX 123 A- I-95 (WB Only), stop and go traffic back to EX 125 - Rt-16/West Newton (WB)
incident
US-6EB
Overturned vehicle in Yarmouth on Rt 6 EB before EX 72 - Willow St, stop and go traffic back to EX 68 - Rt-132
incident
US-1SB
Disabled vehicle. Right lane blocked in Malden on Rt 1 SB at Lynn St
construction
US-6Both EB/WB
Construction through Wellfleet and Eastham in Eastham on Rt 6 EB/WB between Nauset Rd/Salt Pond Rd and RT-6A/Truro Center Rd/Depot Rd
construction
I-95SB
Road construction in Wakefield on RT 95 SB between EX 60 - Salem St and EX 53 - Rt-38
construction
I-95NB
Road construction in Waltham on RT 95 NB between EX 41 - Rt-20 and EX 44 - Trapelo Rd
construction
I-90Both EB/WB
Road construction. Left lane closed in Boston on Mass Pike EB/WB between Fenway Park and Prudential Tunnel
event
I-91Both NB/SB
Traffic flowing freely in Brattleboro on I-91 NB/SB between VT Rt 9/Chesterfield Rd/exit 3 and United States/Canada Border
construction
RT-1ABoth NB/SB
Bridge replacement. Roadway reduced to one lane during work hours in Hampton on RT 1A NB/SB at Hampton River Bridge. Reported by -- NH DOT
construction
I-95Both NB/SB
Road construction on the shoulder in Lynnfield on RT 95 NB/SB between EX 61 - Walnut St and EX 63 - Rt 1
construction
W Roxbury PkyBoth NB/SB
Closed due to road construction in West Roxbury on West Roxbury Pkwy NB/SB between Belgrade Avenue and Centre St
construction
RT-18NB
Off-ramp closed in New Bedford on RT-18 NB off-ramp to WB Rt 195
construction
South Bedford StreetBoth NB/SB
Road construction in Burlington on South Bedford Street NB/SB between Wayside Road and Kimball Avenue
construction
I-195WB
Off-ramp closed in New Bedford on I 195 WB off-ramp to SB Exit 26 - RT-18
construction
Bowker OverpassSB
Road construction. Roadway reduced to one lane in Fenway on Bowker Overpass SB at Boylston Street
construction
I-295Both NB/SB
Road construction. Roadway reduced to two lanes in Cumberland on I 295 NB/SB at EX 20 - Mendon Rd

Latest Traffic Stories